Note: Ballotpedia will be read-only from 9pm CST on February 25-March 9 while Judgepedia is merged into Ballotpedia.
For status updates, visit lucyburns.org.
Ballotpedia's coverage of elections held on March 3, 2015, was limited. Select races were covered live, and all results will be added once the merger is complete.

College of the Sequoias Community College District, Measure I (November 2008)

From Ballotpedia
Jump to: navigation, search
Sign at College of the Sequoias
A College of the Sequoias bond proposition, Measure I ballot question was on the November 4, 2008 ballot for voters in the College of the Sequoias Tulare Campus Improvement District No. 2 in Tulare County, where it was approved.

Measure I authorized the School Facilities Improvement District (SFID) to borrow $28 million to build and upgrade the college center in Tulare.

A 55 percent supermajority vote was required for approval.

Election results

Measure I
ResultVotesPercentage
Approveda Yes 35,713 66.05%
No18,35733.95%
These final election results are from the Tulare County elections office.

Ballot question

The question on the ballot:

Measure I: "To better prepare students for high demand jobs, qualify for $47 million in State building grants, construct a nursing education and training center, upgrade nursing instruction equipment, heating and ventilation, classroom/computer technology, labs, and safety systems, repair aging roofs, electrical, plumbing, upgrade/construct/equip/acquire classrooms, facilities, sites, shall College of the Sequoias Visalia Area Improvement District No. 2 of the College of the Sequoias Community College District issue $28 million in bonds, at legal rates, with citizen oversight, mandatory audits, and all funds staying in the Visalia area?"[1]

See also

External links

BP-Initials-UPDATED.png
Suggest a link


Cite error: <ref> tags exist, but no <references/> tag was found