Santa Clara Measure B is a proposal that appeared on the November 4, 2008 ballot. Measure B was placed on the ballot and to be collected by the Santa Clara Valley Transportation Authority (VTA), to subsidize the operations and maintenance of a BART line in Santa Clara County[1], which is also to be constructed by VTA.

Measure B was approved with 66.78% of the vote. To pass, it needed 66.67% of the vote. After the narrow margin of victory, opponents filed a lawsuit challenging the win and demanding a recount.[2]

Supporters

Primary supporters of the measure included the Valley Transportation Authority (VTA), Silicon Valley Leadership Group (SVLG), and Santa Clara and San Benito Counties Building & Construction Trades Council[3].

The project is currently under engineering studies. VTA is not officially releasing updated construction cost estimates until after the November election[4], but VTA General Manager Michael Burns has told the press that the cost has risen to $6 billion[5]. Local money for construction, raised through a 2000 measure, is funding the local portion of the construction and planning projects[6] In order to secure federal funds, local officials must show they have a way to fund the operating subsidy the extension without cutting other services, making the measure necessary in the eyes of its supporters.[7]

The measure would raise the money by enacting a 30-year 1/8-cent sales tax in the county[8]. The money can only be used to fund BART operations in the county[9]. The sales tax, however, won't go into effect unless the federal and state governments agree to pay a specified amount towards construction costs[10].

A study by a VTA consultant, AECOM, claims that Measure B raises enough money to cover BART's operation and maintenance costs[11]. However, the BART District has declined to sign off that calculation [12].

Once the extension is complete, the BART system would have two more transfer points with Caltrain.

Opponents

Opponents of the sales tax measure include the Sierra Club, Dean Democratic Club of Silicon Valley, VTA Riders' Union, BayRail Alliance, and Silicon Valley Taxpayers' Association, who have serious concerns about VTA's ability to build and fund the ongoing subsidy of the BART line.

In 2000, when VTA placed a 1/2 cent sales tax to fund the BART extension and a variety of transit projects, Carl Guardino of SVLG wrote in the ballot argument: "… pays operating costs for BART, rail, and buses for decades without additional taxes."

Since then, with the rising construction and operating cost of the BART extension[13], along with an economic slump, VTA is underfunded by billions of dollars. Since 2005, VTA and SVLG have been looking for new taxes to fill the shortfall. In 2006, SVLG convinced the County of Santa Clara to place a 1/2 cent general sales tax increase on the June 6, 2006 ballot for county service and transportation. That measure lost 57%-43%[14].

Also since 2000, VTA raised fares and reduced transit services. Between 1999 and 2005, VTA ridership has been reduced by 17 million trips. In 2003, VTA threatened a 21% transit cut. It was averted when transit riders and workers pressured the VTA Board to bond against the 2000 sales tax funds.

Measure B opponents asserted that Measure B would not be enough and would impact VTA existing services and other transit priorities. Just before the the VTA Board of Directors placed Measure B on the ballot in August, BayRail Alliance issued a memo stating that, based on the agreement between VTA and BART made in 2001[15], Measure B is insufficient to fund the ongoing cost of the BART extension. According to BayRail Alliance, Measure B is calculated to cover about 80% of the advance payment to BART.

In addition to the ongoing cost, Measure B opponents also questions VTA's ability to build the BART project. After the county sales tax proposal failed in 2006, VTA approved a tax expenditure plan that assumes a new 1/4 cent sales tax (twice of what Measure B would bring) that never existed. Months before Measure B was placed on the ballot, VTA's general manager already signaled that it might give up on a light rail extension from Alum Rock Station to Eastridge due to the lack of funds[16]. Caltrain supporters are also concerned about VTA's ability to provide matching funds to electrify Caltrain[17].

External links

References

  1. Smart Voter on Santa Clara Measure B
  2. Mercury News, "Recount demand for Measure B: BART tax is headed to court", November 28, 2008
  3. Mercury News
  4. BART details
  5. Podcast
  6. VTA Silicon Valley Rapid Transit corridor
  7. Morgan Hill Times, "Letters to the editor: Santa Teresa boulevard extension if bridge to nowhere"
  8. http://smartvoter.org/2008/11/04/ca/scl/meas/B/
  9. http://smartvoter.org/2008/11/04/ca/scl/meas/B/
  10. http://smartvoter.org/2008/11/04/ca/scl/meas/B/
  11. http://www.vta.org/inside/boards/correspondence/2008/08_08_08.pdf
  12. http://www.novtatax.org/wordpress/wp-content/uploads/2008/10/Daily%20Post%20Oct%2030%202008.pdf
  13. Transportation Injustice
  14. June 2006 Election Results
  15. Memo to the VTA Board regarding the proposed 1/8 tax increase
  16. August 7, 2008 VTA Board agenda
  17. August 7, 2008 Caltrain Joint Powers Board meeting agenda
Personal tools