Public policy made simple. Dive into our information hub today!

Dallas, Texas, Street Bond Issue, Proposition A (November 2017)

From Ballotpedia
Jump to: navigation, search
Downtown Dallas panorama at sunset, from Inwood Rd., 05-05-11.jpg
Proposition A: Dallas Street Bond Issue
Seal of Dallas, Texas.png
The basics
Election date:
November 7, 2017
Status:
Approveda Approved
Topic:
City bonds
Related articles
City bonds on the ballot
November 7, 2017 ballot measures in Texas
Dallas County, Texas ballot measures
See also
Dallas, Texas

A bond issue proposition to fund the improvement of streets, Proposition A, was on the ballot for Dallas voters in Dallas County, Texas, on November 7, 2017. It was approved.

A yes vote was a vote in favor of increasing the city's debt by $534 million by issuing general obligation bonds in that amount to fund the improvement of streets and pedestrian walkways.
A no vote was a vote against increasing the city's debt by $534 million by issuing general obligation bonds in that amount to fund the improvement of streets and pedestrian walkways.

The exact amount of the proposed bond was $533,981,000. The bonds must be repaid within 20 years. The total repayment amount for Proposition A bonds—principal and interest—was estimated at $724,650,750.[1]

Election results

Proposition A
ResultVotesPercentage
Approveda Yes 38,891 78.7%
No10,52421.3%
Election results from Dallas County Elections Office

Project list

Full list

A full list of the proposed projects to be funded by the Proposition A bond revenue—including both projects that require matching funds and those that don't—is below:[2]

DescriptionCouncil districtCost
Phase 1 - Upgrading the City's Traffic Signal SystemSW$20,000,000
Installation of warranted traffic signals at 68 locations citywideSW$18,350,000
Funding for the City's 50/50 Cost Share Sidewalk Replacement Program and the installation of Barrier Free RampsSW$6,240,000
Funding to address critical bridge repairs throughout the CitySW$6,300,000
Safety Improvements to the intersection of Garland/Gaston and East Grande Avenue. A total of $4,500,000 in match funding is being provided by the Texas Dept. of Transportation.2, 9, 14$1,100,000
Install Quiet zone required infrastructure improvements at railroad crossings. The project leverage $2,200,000 from the Texas Dept. of Transportation.6, 7, 9$543,000
Construct a new 4 lane divided roadway including a new bridge over UP railroad tracks just south of Forney Rd with sidewalk and bicycle facilities. The project is receiving a total of $9,913,563 in match funds from the North Central Council of Governments and private funding.7$9,200,000
Intersection Improvements at the LBJ/Skillman Interchange. Project includes lighting and streetscaping. Match funding of $65,000,000 provided by the Texas Dept. of Transportation.10$6,500,000
Pedestrian and bicycle safety enhancements including traffic signals, sidewalks, crosswalks, and lighting. A total of $4,456,656 in match funding from both the North Central Texas Council of Governments and the Texas Department of Transportation.14$1,100,000
Street reconstruction of Riverfront from UPRR tracks to Cadiz Street. Will also include bike facilities. Match funding of $4,600,000 from Dallas County.1, 2 ,6 $4,600,000
Street reconstruction project. Will will also include bike lanes. $3,200,000 matching funds from Dallas County.1, 3$4,000,000
Construct a new 4 lane divided roadway including a new bridge over UPRR and new traffic signals at Singleton6$1,900,000
Construct a new 4 lane undivided roadway with bike lanes. $3,200,000 in match funding8$1,800,000
Convert existing roadway to a two way facility. The project is receiving a total $12,800,000 in match funds14$8,000,000
Install proper drainage improvements at these locations. Match funding of $250,0009$700,000
Reconstructing an existing 4 lane undivided roadway to a 4 lane divided roadway. $4,000,000 in match funding is being provided by the Texas Dept. of Transportation.7$2,000,000
Resurfacing existing 4 lane undivided roadway to a 4 lane divided roadway13$2,200,000
Resurfacing of the roadwaybetween Cromwell and Marsh Lane6, 13$1,100,000
Reconstruct existing streets and alleys to City standard4$6,000,000
Reconstruct the street and expandit to a 4 lane divided roadway with bike lanes and sidewalks6$7,600,000
Complete Street reconstruction project to provide a four lane divided roadway with sidewalks and dedicated bicycle facilities2$9,700,000
Complete Street project to providea two lane two way street with bike lanes and sidewalks5$7,101,000
Street improvement project that will add 4 lane divided roadway with sidewalks5, 7, 8$13,980,000
This is a street improvement project that will improve the current roadway from a 2 lane undivided asphalt road to a four lane undivided concrete street with sidewalks and bike lanes11$3,000,000
This project will completely reconstruct the street and upgrades the sidewalks.1$214,000
Alley Petition Project3$122,000
Street Petition Project3$850,000
Street Petition Project3$1,969,000
Street Petition Project4$539,000
Street Petition Project5$1,457,000
Street Petition Project7$1,090,000
Sidewalk Petition Project7$37,000
Alley Petition Project9$86,000
Sidewalk Petition Project9$122,000
Alley Petition Project13$62,000
Alley Petition Project13$212,000
Street Petition Project13$5,512,000
Alley Petition Project14$174,000
Street Petition Project14$146,000
Complete Street Project. Reducescurrent roadway from 6 lanes to 4 lanes. The project will include the installation of wider sidewalks, pedestrian lighting and landscaping9$6,300,000
Infrastructure Improvements in the UT Southwestern Medical District including sidewalks, street improvements and pedestrianlighting2$7,500,000
Sidewalk Improvements1$362,000
Sidewalk Improvements1$362,807
Sidewalk Improvements1$447,125
Street Lighting1$500,000
Street Reconstruction Local Streets1$1,537,988
Street Reconstruction Local Streets1$759,785
Street Reconstruction Local Streets1$414,430
Street Reconstruction Local Streets1$947,148
Street Reconstruction Local Streets1$382,678
Street Reconstruction Local Streets1$591,967
Street Reconstruction Local Streets1$601,990
Street Reconstruction Thoroughfares1$1,162,793
Street Resurfacing Local Streets1$334,295
Street Resurfacing Local Streets1$229,810
Street Resurfacing Local Streets1$257,250
Street Resurfacing Local Streets1$58,859
Street Resurfacing Local Streets1$135,862
Street Resurfacing Local Streets1$171,500
Street Resurfacing Local Streets1$288,529
Street Resurfacing Local Streets1$169,259
Street Resurfacing Local Streets1$149,205
Street Resurfacing Local Streets1$217,874
Street Resurfacing Local Streets1$217,493
Street Resurfacing Local Streets1$288,463
Street Resurfacing Local Streets1$319,191
Street Resurfacing Local Streets1$302,464
Street Resurfacing Local Streets1$360,848
Street Resurfacing Local Streets1$321,855
Street Resurfacing Local Streets1$228,095
Street Resurfacing Local Streets1$158,260
Street Resurfacing Local Streets1$180,075
Street Resurfacing Local Streets1$281,260
Street Resurfacing Local Streets1$296,974
Street Resurfacing Thoroughfares1$585,244
Street Resurfacing Thoroughfares1$844,638
Street Resurfacing Thoroughfares1$75,518
Street Resurfacing Thoroughfares1$230,736
Street Resurfacing Thoroughfares1$93,643
Street Resurfacing Thoroughfares1$148,382
Street Resurfacing Thoroughfares1$145,678
Street Resurfacing Thoroughfares1$403,512
Streetscape/Urban Design1$1,590,767
Streetscape/Urban Design1$1,000,000
Street Improvement1$2,000,000
Street Improvement1$2,143,750
Traffic Intersection Capacity and Safety Improvements1$260,000
Alley Petition2$205,427
Alley Reconstruction2$209,573
Alley Reconstruction2$195,878
Alley Reconstruction2$301,620
Alley Reconstruction2$330,922
Alley Reconstruction2$193,648
Alley Reconstruction2$262,126
Alley Reconstruction2$59,560
Alley Reconstruction2$216,580
Alley Reconstruction2$243,653
Sidewalk Improvements2$79,872
Sidewalk Improvements2$500,000
Sidewalk Improvements2$94,833
Street Reconstruction Local Streets2$1,286,618
Street Reconstruction Local Streets2$1,944,975
Street Reconstruction Local Streets2$1,342,845
Street Reconstruction Local Streets2$153,468
Street Reconstruction Local Streets2$786,854
Street Reconstruction Local Streets2$570,544
Street Reconstruction Local Streets2$496,125
Street Reconstruction Local Streets2$575,009
Street Reconstruction Local Streets2$366,471
Street Resurfacing Local Streets2$169,785
Street Resurfacing Local Streets2$116,346
Street Resurfacing Local Streets2$128,042
Street Resurfacing Local Streets2$133,050
Street Resurfacing Local Streets2$61,809
Street Resurfacing Local Streets2$122,108
Street Resurfacing Local Streets2$171,962
Street Resurfacing Local Streets2$68,874
Street Resurfacing Local Streets2$71,344
Street Resurfacing Local Streets2$89,647
Street Resurfacing Local Streets2$187,887
Street Resurfacing Local Streets2$158,891
Street Resurfacing Local Streets2$119,741
Street Resurfacing Local Streets2$140,699
Street Resurfacing Local Streets2$70,555
Street Resurfacing Local Streets2$64,897
Street Resurfacing Local Streets2$234,135
Street Resurfacing Local Streets2$57,075
Street Resurfacing Local Streets2$111,644
Street Resurfacing Local Streets2$83,246
Street Resurfacing Local Streets2$176,068
Street Resurfacing Local Streets2$98,235
Street Resurfacing Local Streets2$294,085
Street Resurfacing Local Streets2$87,122
Street Resurfacing Local Streets2$117,203
Street Resurfacing Local Streets2$197,259
Street Resurfacing Local Streets2$120,050
Street Resurfacing Local Streets2$44,076
Street Resurfacing Local Streets2$180,938
Street Resurfacing Local Streets2$187,484
Street Resurfacing Local Streets2$269,509
Street Resurfacing Local Streets2$97,785
Street Resurfacing Local Streets2$42,704
Street Resurfacing Local Streets2$82,429
Street Resurfacing Local Streets2$427,902
Street Resurfacing Local Streets2$77,381
Street Resurfacing Local Streets2$237,237
Street Resurfacing Local Streets2$101,905
Street Resurfacing Local Streets2$243,433
Street Resurfacing Local Streets2$166,527
Street Resurfacing Local Streets2$72,785
Street Resurfacing Local Streets2$126,676
Street Resurfacing Local Streets2$142,345
Street Resurfacing Local Streets2$273,786
Street Resurfacing Local Streets2$204,040
Street Resurfacing Local Streets2$176,183
Street Resurfacing Local Streets2$161,210
Street Resurfacing Local Streets2$101,014
Street Resurfacing Thoroughfares2$147,464
Street Resurfacing Thoroughfares2$242,873
Street Resurfacing Thoroughfares2$192,080
Street Resurfacing Thoroughfares2$99,401
Street Resurfacing Thoroughfares2$305,031
Street Resurfacing Thoroughfares2$135,485
Street Resurfacing Thoroughfares2$80,159
Street Resurfacing Thoroughfares2$84,229
Street Resurfacing Thoroughfares2$314,098
Street Resurfacing Thoroughfares2$103,472
Thoroughfares2$1,500,000
Thoroughfares2$4,250,000
Alley Reconstruction3$618,209
Alley Reconstruction3$372,008
Alley Reconstruction3$198,107
Alley Reconstruction3$139,822
Alley Reconstruction3$456,411
Sidewalk Improvements3$350,000
Street Reconstruction Local Streets3$1,305,305
Street Reconstruction Local Streets3$912,209
Street Reconstruction Local Streets3$1,377,905
Street Reconstruction Local Streets3$1,437,605
Street Reconstruction Thoroughfares3$950,000
Street Resurfacing Local Streets3$360,459
Street Resurfacing Local Streets3$414,173
Street Resurfacing Local Streets3$44,796
Street Resurfacing Local Streets3$425,457
Street Resurfacing Local Streets3$356,034
Street Resurfacing Local Streets3$301,840
Street Resurfacing Local Streets3$261,469
Street Resurfacing Local Streets3$186,523
Street Resurfacing Local Streets3$307,225
Street Resurfacing Local Streets3$87,259
Street Resurfacing Local Streets3$721,398
Street Resurfacing Local Streets3$270,901
Street Resurfacing Local Streets3$294,225
Street Resurfacing Local Streets3$287,434
Street Resurfacing Local Streets3$444,322
Street Resurfacing Local Streets3$339,982
Street Resurfacing Local Streets3$113,499
Street Resurfacing Local Streets3$310,312
Street Resurfacing Local Streets3$193,349
Street Resurfacing Local Streets3$96,966
Street Resurfacing Local Streets3$251,488
Street Resurfacing Local Streets3$185,597
Street Resurfacing Local Streets3$306,745
Street Resurfacing Local Streets3$219,791
Street Resurfacing Local Streets3$278,345
Street Resurfacing Local Streets3$63,700
Street Resurfacing Local Streets3$189,027
Street Resurfacing Local Streets3$259,445
Street Resurfacing Thoroughfares3$427,893
Street Resurfacing Thoroughfares3$222,676
Thoroughfares3$5,741,343
Traffic Intersection Capacity & Safety Improvement3$428,750
Alley Reconstruction4$416,303
Alley Reconstruction4$353,097
Alley Reconstruction4$86,377
Alley Reconstruction4$343,343
Alley Reconstruction4$674,981
Alley Reconstruction4$561,444
Alley Reconstruction4$666,398
Alley Reconstruction4$360,120
Alley Reconstruction4$266,871
Alley Reconstruction4$438,933
Street Petition Project4$895,000
Street Reconstruction Local Streets4$3,252,260
Street Reconstruction Local Streets4$1,140,900
Street Reconstruction Local Streets4$842,916
Street Reconstruction Local Streets4$2,255,054
Street Reconstruction Local Streets4$572,316
Street Reconstruction Local Streets4$944,622
Street Reconstruction Local Streets4$939,826
Street Reconstruction Local Streets4$1,200,000
Street Reconstruction Local Streets4$1,040,705
Street Reconstruction Local Streets4$651,412
Street Reconstruction Local Streets4$1,077,749
Street Reconstruction Local Streets4$1,047,320
Street Reconstruction Local Streets4$442,822
Street Reconstruction Local Streets4$561,117
Street Reconstruction Thoroughfares4$1,510,514
Street Reconstruction Thoroughfares4$1,325,977
Street Reconstruction Thoroughfares4$452,301
Street Resurfacing Local Streets4$209,470
Street Resurfacing Local Streets4$324,718
Street Resurfacing Local Streets4$204,531
Street Resurfacing Local Streets4$55,052
Street Resurfacing Local Streets4$158,603
Street Resurfacing Local Streets4$84,275
Street Resurfacing Local Streets4$190,537
Street Resurfacing Local Streets4$94,771
Street Resurfacing Local Streets4$795,074
Street Resurfacing Local Streets4$73,676
Street Resurfacing Local Streets4$324,272
Street Resurfacing Local Streets4$140,356
Street Resurfacing Local Streets4$598,261
Street Resurfacing Local Streets4$92,713
Street Resurfacing Local Streets4$61,466
Street Resurfacing Thoroughfares4$1,481,143
Street Resurfacing Thoroughfares4$64,964
Street Resurfacing Thoroughfares4$336,608
Street Resurfacing Thoroughfares4$461,747
Target Neighborhood4$347,603
Target Neighborhood4$236,515
Target Neighborhood4$176,061
Target Neighborhood4$566,909
Alley Reconstruction5$225,817
Alley Reconstruction5$503,230
Alley Reconstruction5$396,214
Alley Reconstruction5$221,995
Alley Reconstruction5$473,291
Sidewalk Improvements5$600,000
Street Reconstruction Local Streets5$657,200
Street Reconstruction Local Streets5$1,630,432
Street Reconstruction Local Streets5$901,459
Street Reconstruction Local Streets5$1,733,626
Street Resurfacing Local Streets5$283,935
Street Resurfacing Local Streets5$243,736
Street Resurfacing Local Streets5$175,479
Street Resurfacing Local Streets5$233,240
Street Resurfacing Local Streets5$157,094
Street Resurfacing Local Streets5$480,577
Street Resurfacing Local Streets5$365,925
Street Resurfacing Local Streets5$217,496
Street Resurfacing Local Streets5$295,838
Street Resurfacing Local Streets5$153,440
Street Resurfacing Local Streets5$69,412
Street Resurfacing Local Streets5$253,683
Street Resurfacing Local Streets5$31,583
Street Resurfacing Local Streets5$385,909
Street Resurfacing Local Streets5$168,550
Street Resurfacing Local Streets5$196,779
Street Resurfacing Local Streets5$163,165
Street Resurfacing Local Streets5$74,637
Street Resurfacing Local Streets5$142,722
Street Resurfacing Local Streets5$171,808
Street Resurfacing Local Streets5$286,611
Street Resurfacing Thoroughfares5$1,534,411
Target Neighborhood5$1,522,200
Target Neighborhood5$3,268,505
Thoroughfares5$4,500,000
Thoroughfares5$2,000,000
Alley Reconstruction6$796,250
Alley Reconstruction6$305,442
Alley Reconstruction6$114,979
Alley Reconstruction6$458,322
Alley Reconstruction6$384,430
Street Reconstruction Local Streets6$436,425
Street Reconstruction Local Streets6$851,847
Street Reconstruction Local Streets6$1,056,682
Street Reconstruction Local Streets6$963,242
Street Reconstruction Local Streets6$1,515,109
Street Reconstruction Local Streets6$786,854
Street Reconstruction Local Streets6$698,992
Street Reconstruction Local Streets6$1,125,377
Street Reconstruction Local Streets6$714,916
Street Reconstruction Local Streets6$978,855
Street Reconstruction Thoroughfares6$768,994
Street Resurfacing Local Streets6$245,794
Street Resurfacing Local Streets6$57,590
Street Resurfacing Local Streets6$208,853
Street Resurfacing Local Streets6$120,599
Street Resurfacing Local Streets6$51,313
Street Resurfacing Local Streets6$896,633
Street Resurfacing Local Streets6$165,257
Street Resurfacing Local Streets6$443,225
Street Resurfacing Local Streets6$157,094
Street Resurfacing Local Streets6$249,052
Street Resurfacing Thoroughfares6$175,513
Street Resurfacing Thoroughfares6$242,741
Street Resurfacing Thoroughfares6$654,856
Street Resurfacing Thoroughfares6$512,408
Street Resurfacing Thoroughfares6$279,133
Street Resurfacing Thoroughfares6$955,255
Street Resurfacing Thoroughfares6$216,193
Street Resurfacing Thoroughfares6$105,758
Street Resurfacing Thoroughfares6$499,785
Street Resurfacing Thoroughfares6$584,815
Street Resurfacing Thoroughfares6$113,670
Street Resurfacing Thoroughfares6$107,085
Street Resurfacing Thoroughfares6$639,078
Street Resurfacing Thoroughfares6$406,695
Street Resurfacing Thoroughfares6$484,899
Street Resurfacing Thoroughfares6$390,163
Target Neighborhood6$928,355
Target Neighborhood6$651,477
Thoroughfares6$250,000
Alley Reconstruction7$351,624
Alley Reconstruction7$167,212
Alley Reconstruction7$293,020
Alley Reconstruction7$363,090
Alley Reconstruction7$301,301
Alley Reconstruction7$296,842
Alley Reconstruction7$321,367
Alley Reconstruction7$486,668
Alley Reconstruction7$398,762
Alley Reconstruction7$171,672
Alley Reconstruction7$373,282
Alley Reconstruction7$465,010
Alley Reconstruction7$489,853
Alley Reconstruction7$169,124
Alley Reconstruction7$476,476
Alley Reconstruction7$309,264
Alley Reconstruction7$261,170
Alley Reconstruction7$282,191
Alley Reconstruction7$393,985
Alley Reconstruction7$469,151
Sidewalk Improvements7$58,223
Sidewalk Improvements7$33,413
Sidewalk Improvements7$20,990
Sidewalk Improvements7$60,188
Sidewalk Improvements7$25,703
Sidewalk Improvements7$245,000
Sidewalk Improvements7$81,164
Sidewalk Improvements7$161,848
Sidewalk Improvements7$41,216
Sidewalk Improvements7$224,789
Sidewalk Improvements7$119,945
Street Lighting7$424,000
Street Lighting7$604,800
Street Lighting7$16,000
Street Lighting7$112,000
Street Lighting7$600,000
Street Reconstruction Local Streets7$255,210
Street Resurfacing Local Streets7$106,913
Street Resurfacing Local Streets7$178,017
Street Resurfacing Local Streets7$206,245
Street Resurfacing Local Streets7$276,458
Street Resurfacing Local Streets7$338,061
Street Resurfacing Local Streets7$319,573
Street Resurfacing Local Streets7$122,005
Street Resurfacing Local Streets7$326,149
Street Resurfacing Local Streets7$108,765
Street Resurfacing Local Streets7$193,726
Street Resurfacing Local Streets7$330,275
Street Resurfacing Local Streets7$103,552
Street Resurfacing Local Streets7$618,120
Street Resurfacing Local Streets7$346,910
Street Resurfacing Local Streets7$481,572
Street Resurfacing Local Streets7$486,248
Street Resurfacing Local Streets7$102,900
Street Resurfacing Local Streets7$272,857
Street Resurfacing Local Streets7$137,317
Street Resurfacing Local Streets7$411,600
Street Resurfacing Local Streets7$797,990
Street Resurfacing Local Streets7$410,468
Street Resurfacing Thoroughfares7$1,388,876
Street Resurfacing Thoroughfares7$617,469
Street Resurfacing Thoroughfares7$247,132
Street Resurfacing Thoroughfares7$500,780
Streetscape / Urban Design7$750,000
Streetscape / Urban Design7$521,250
Target Neighborhood7$352,261
Target Neighborhood7$640,662
Target Neighborhood7$563,267
Target Neighborhood7$767,030
Alley Reconstruction8$362,453
Alley Reconstruction8$425,835
Alley Reconstruction8$406,406
Alley Reconstruction8$411,184
Alley Reconstruction8$513,104
Alley Reconstruction8$190,782
Alley Reconstruction8$385,704
Sidewalk Improvements8$620,000
Street Lighting8$350,000
Street Reconstruction Local Streets8$906,420
Street Reconstruction Local Streets8$435,000
Street Reconstruction Local Streets8$577,820
Street Reconstruction Local Streets8$94,098
Street Reconstruction Local Streets8$1,029,459
Street Reconstruction Local Streets8$706,482
Street Reconstruction Local Streets8$137,757
Street Reconstruction Local Streets8$700,363
Street Reconstruction Local Streets8$406,326
Street Reconstruction Thoroughfares8$689,779
Street Resurfacing Local Streets8$146,770
Street Resurfacing Local Streets8$182,819
Street Resurfacing Local Streets8$93,741
Street Resurfacing Local Streets8$135,279
Street Resurfacing Local Streets8$57,418
Street Resurfacing Local Streets8$58,790
Street Resurfacing Local Streets8$63,832
Street Resurfacing Local Streets8$143,408
Street Resurfacing Local Streets8$60,471
Street Resurfacing Local Streets8$151,675
Street Resurfacing Local Streets8$16,636
Street Resurfacing Local Streets8$167,727
Street Resurfacing Local Streets8$443,979
Street Resurfacing Local Streets8$197,602
Street Resurfacing Local Streets8$179,698
Street Resurfacing Local Streets8$250,973
Street Resurfacing Local Streets8$132,741
Street Resurfacing Local Streets8$53,542
Street Resurfacing Local Streets8$114,528
Street Resurfacing Local Streets8$165,703
Street Resurfacing Local Streets8$145,604
Street Resurfacing Local Streets8$226,826
Street Resurfacing Local Streets8$220,240
Street Resurfacing Local Streets8$136,343
Street Resurfacing Local Streets8$331,715
Street Resurfacing Local Streets8$354,771
Street Resurfacing Local Streets8$59,716
Street Resurfacing Local Streets8$144,918
Street Resurfacing Local Streets8$66,679
Street Resurfacing Local Streets8$107,085
Street Resurfacing Local Streets8$125,812
Street Resurfacing Local Streets8$188,650
Street Resurfacing Local Streets8$66,885
Street Resurfacing Local Streets8$104,546
Street Resurfacing Local Streets8$190,365
Street Resurfacing Local Streets8$101,494
Street Resurfacing Local Streets8$216,981
Street Resurfacing Local Streets8$286,679
Street Resurfacing Local Streets8$192,389
Street Resurfacing Local Streets8$258,073
Street Resurfacing Local Streets8$112,504
Street Resurfacing Local Streets8$48,294
Street Resurfacing Local Streets8$77,244
Street Resurfacing Local Streets8$168,379
Street Resurfacing Local Streets8$55,738
Street Resurfacing Local Streets8$85,476
Street Resurfacing Local Streets8$53,199
Street Resurfacing Local Streets8$51,176
Street Resurfacing Local Streets8$26,685
Street Resurfacing Local Streets8$27,028
Street Resurfacing Local Streets8$233,583
Street Resurfacing Local Streets8$53,199
Street Resurfacing Thoroughfares8$189,679
Street Resurfacing Thoroughfares8$332,607
Street Resurfacing Thoroughfares8$259,856
Street Resurfacing Thoroughfares8$165,875
Street Resurfacing Thoroughfares8$146,713
Street Resurfacing Thoroughfares8$146,701
Street Resurfacing Thoroughfares8$64,175
Thoroughfares8$4,159,814
Thoroughfares8$750,000
Alley Reconstruction9$103,025
Alley Reconstruction9$406,250
Alley Reconstruction9$205,400
Alley Reconstruction9$242,450
Alley Reconstruction9$88,075
Alley Reconstruction9$210,925
Alley Reconstruction9$232,050
Alley Reconstruction9$227,825
Alley Reconstruction9$273,650
Alley Reconstruction9$86,775
Sidewalk Improvements9$476,776
Street Reconstruction Local Streets9$1,030,121
Street Resurfacing Local Streets9$182,750
Street Resurfacing Local Streets9$228,198
Street Resurfacing Local Streets9$165,189
Street Resurfacing Local Streets9$94,599
Street Resurfacing Local Streets9$277,761
Street Resurfacing Local Streets9$150,337
Street Resurfacing Local Streets9$141,556
Street Resurfacing Local Streets9$162,068
Street Resurfacing Local Streets9$58,550
Street Resurfacing Local Streets9$93,570
Street Resurfacing Local Streets9$224,288
Street Resurfacing Local Streets9$173,284
Street Resurfacing Local Streets9$96,829
Street Resurfacing Local Streets9$42,429
Street Resurfacing Local Streets9$127,013
Street Resurfacing Local Streets9$322,763
Street Resurfacing Local Streets9$117,375
Street Resurfacing Local Streets9$214,855
Street Resurfacing Local Streets9$147,799
Street Resurfacing Local Streets9$97,241
Street Resurfacing Local Streets9$148,553
Street Resurfacing Local Streets9$52,685
Street Resurfacing Local Streets9$103,860
Street Resurfacing Local Streets9$169,065
Street Resurfacing Local Streets9$53,474
Street Resurfacing Local Streets9$222,950
Street Resurfacing Local Streets9$383,062
Street Resurfacing Local Streets9$238,316
Street Resurfacing Local Streets9$30,664
Street Resurfacing Local Streets9$99,642
Street Resurfacing Local Streets9$60,745
Street Resurfacing Local Streets9$49,152
Street Resurfacing Local Streets9$161,313
Street Resurfacing Local Streets9$174,827
Street Resurfacing Local Streets9$113,842
Street Resurfacing Local Streets9$103,517
Street Resurfacing Local Streets9$117,375
Street Resurfacing Local Streets9$209,607
Street Resurfacing Local Streets9$350,032
Street Resurfacing Local Streets9$209,093
Street Resurfacing Local Streets9$177,331
Street Resurfacing Local Streets9$59,442
Street Resurfacing Local Streets9$121,456
Street Resurfacing Local Streets9$168,173
Street Resurfacing Local Streets9$212,660
Street Resurfacing Local Streets9$127,870
Street Resurfacing Local Streets9$156,065
Street Resurfacing Local Streets9$190,674
Street Resurfacing Local Streets9$53,542
Street Resurfacing Local Streets9$53,714
Street Resurfacing Local Streets9$107,942
Street Resurfacing Local Streets9$71,618
Street Resurfacing Local Streets9$147,559
Street Resurfacing Local Streets9$61,809
Street Resurfacing Local Streets9$127,184
Street Resurfacing Local Streets9$376,065
Street Resurfacing Local Streets9$104,032
Street Resurfacing Local Streets9$115,008
Street Resurfacing Local Streets9$53,885
Street Resurfacing Local Streets9$57,110
Street Resurfacing Local Streets9$35,466
Street Resurfacing Local Streets9$65,719
Street Resurfacing Local Streets9$175,136
Street Resurfacing Local Streets9$155,551
Street Resurfacing Local Streets9$106,399
Street Resurfacing Local Streets9$305,922
Street Resurfacing Local Streets9$106,570
Street Resurfacing Local Streets9$30,596
Street Resurfacing Local Streets9$93,570
Street Resurfacing Local Streets9$219,417
Street Resurfacing Local Streets9$74,671
Street Resurfacing Local Streets9$171,946
Street Resurfacing Local Streets9$141,488
Street Resurfacing Local Streets9$180,727
Street Resurfacing Local Streets9$160,078
Street Resurfacing Local Streets9$86,265
Street Resurfacing Local Streets9$157,231
Street Resurfacing Local Streets9$108,251
Street Resurfacing Local Streets9$52,856
Street Resurfacing Local Streets9$50,009
Street Resurfacing Local Streets9$52,376
Street Resurfacing Local Streets9$85,304
Street Resurfacing Local Streets9$211,631
Street Resurfacing Local Streets9$149,102
Street Resurfacing Local Streets9$218,868
Street Resurfacing Local Streets9$150,817
Street Resurfacing Local Streets9$61,466
Street Resurfacing Local Streets9$83,761
Street Resurfacing Local Streets9$155,722
Street Resurfacing Local Streets9$121,285
Street Resurfacing Local Streets9$100,671
Street Resurfacing Local Streets9$144,918
Street Resurfacing Local Streets9$335,283
Street Resurfacing Local Streets9$154,213
Street Resurfacing Local Streets9$172,289
Street Resurfacing Local Streets9$154,213
Street Resurfacing Local Streets9$104,718
Street Resurfacing Local Streets9$171,877
Street Resurfacing Local Streets9$179,218
Street Resurfacing Local Streets9$293,745
Street Resurfacing Local Streets9$189,165
Street Resurfacing Local Streets9$253,683
Street Resurfacing Local Streets9$113,842
Street Resurfacing Local Streets9$74,808
Street Resurfacing Local Streets9$77,004
Street Resurfacing Local Streets9$117,066
Street Resurfacing Local Streets9$180,898
Street Resurfacing Local Streets9$124,749
Street Resurfacing Local Streets9$240,512
Street Resurfacing Local Streets9$52,685
Street Resurfacing Local Streets9$216,982
Street Resurfacing Local Streets9$164,228
Street Resurfacing Local Streets9$421,204
Street Resurfacing Local Streets9$150,337
Street Resurfacing Local Streets9$136,994
Street Resurfacing Local Streets9$52,513
Street Resurfacing Local Streets9$56,081
Street Resurfacing Local Streets9$342,520
Street Resurfacing Local Streets9$82,937
Street Resurfacing Local Streets9$142,379
Street Resurfacing Local Streets9$80,228
Street Resurfacing Local Streets9$107,256
Street Resurfacing Local Streets9$136,891
Street Resurfacing Local Streets9$63,009
Street Resurfacing Local Streets9$66,714
Street Resurfacing Local Streets9$51,515
Street Resurfacing Local Streets9$53,199
Street Resurfacing Local Streets9$157,231
Street Resurfacing Local Streets9$199,317
Street Resurfacing Local Streets9$117,718
Street Resurfacing Thoroughfares9$450,000
Street Resurfacing Thoroughfares9$129,585
Street Resurfacing Thoroughfares9$145,981
Street Resurfacing Thoroughfares9$431,494
Street Resurfacing Thoroughfares9$217,119
Street Resurfacing Thoroughfares9$191,394
Street Resurfacing Thoroughfares9$137,200
Street Resurfacing Thoroughfares9$203,851
Street Resurfacing Thoroughfares9$107,565
Street Resurfacing Thoroughfares9$365,021
Street Resurfacing Thoroughfares9$90,243
Street Resurfacing Thoroughfares9$90,552
Street Resurfacing Thoroughfares9$155,070
Street Resurfacing Thoroughfares9$251,968
Street Resurfacing Thoroughfares9$219,625
Street Resurfacing Thoroughfares9$277,761
Street Resurfacing Thoroughfares9$329,878
Traffic Intersection Capacity & Safety Improvement9$846,000
Alley Reconstruction10$264,992
Alley Reconstruction10$228,046
Alley Reconstruction10$493,675
Alley Reconstruction10$447,811
Alley Reconstruction10$103,513
Alley Reconstruction10$268,814
Alley Reconstruction10$299,096
Street Reconstruction Local Streets10$1,339,207
Street Reconstruction Local Streets10$408,807
Street Reconstruction Local Streets10$601,802
Street Reconstruction Local Streets10$1,726,846
Street Reconstruction Local Streets10$620,156
Street Reconstruction Local Streets10$463,381
Street Reconstruction Local Streets10$259,804
Street Reconstruction Local Streets10$447,836
Street Reconstruction Local Streets10$732,115
Street Reconstruction Local Streets10$525,396
Street Reconstruction Local Streets10$574,182
Street Reconstruction Local Streets10$534,988
Street Reconstruction Local Streets10$257,324
Street Reconstruction Local Streets10$255,670
Street Reconstruction Thoroughfares10$75,000
Street Resurfacing Local Streets10$443,396
Street Resurfacing Local Streets10$367,284
Street Resurfacing Local Streets10$203,120
Street Resurfacing Local Streets10$126,190
Street Resurfacing Local Streets10$165,532
Street Resurfacing Local Streets10$111,406
Street Resurfacing Local Streets10$64,690
Street Resurfacing Local Streets10$54,057
Street Resurfacing Local Streets10$92,233
Street Resurfacing Local Streets10$96,280
Street Resurfacing Local Streets10$110,446
Street Resurfacing Local Streets10$86,470
Street Resurfacing Local Streets10$64,278
Street Resurfacing Local Streets10$165,189
Street Resurfacing Local Streets10$207,480
Street Resurfacing Local Streets10$101,013
Street Resurfacing Local Streets10$156,064
Street Resurfacing Local Streets10$155,551
Street Resurfacing Local Streets10$150,321
Street Resurfacing Local Streets10$100,000
Street Resurfacing Local Streets10$146,735
Street Resurfacing Local Streets10$192,732
Street Resurfacing Local Streets10$50,833
Street Resurfacing Local Streets10$168,893
Street Resurfacing Local Streets10$118,232
Street Resurfacing Local Streets10$58,962
Street Resurfacing Local Streets10$52,205
Street Resurfacing Local Streets10$118,061
Street Resurfacing Local Streets10$175,582
Street Resurfacing Local Streets10$145,809
Street Resurfacing Local Streets10$98,510
Street Resurfacing Local Streets10$55,840
Street Resurfacing Local Streets10$71,310
Street Resurfacing Local Streets10$82,251
Street Resurfacing Local Streets10$163,268
Street Resurfacing Local Streets10$81,050
Street Resurfacing Local Streets10$116,311
Street Resurfacing Local Streets10$166,355
Street Resurfacing Local Streets10$111,990
Street Resurfacing Local Streets10$152,018
Street Resurfacing Local Streets10$219,589
Street Resurfacing Local Streets10$260,954
Street Resurfacing Local Streets10$50,833
Street Resurfacing Local Streets10$55,738
Street Resurfacing Local Streets10$52,513
Street Resurfacing Local Streets10$143,751
Street Resurfacing Local Streets10$84,309
Street Resurfacing Local Streets10$141,488
Street Resurfacing Local Streets10$155,551
Street Resurfacing Local Streets10$215,678
Street Resurfacing Local Streets10$199,557
Street Resurfacing Local Streets10$60,642
Street Resurfacing Local Streets10$139,361
Street Resurfacing Local Streets10$145,226
Street Resurfacing Local Streets10$229,433
Street Resurfacing Local Streets10$89,695
Street Resurfacing Local Streets10$103,689
Street Resurfacing Local Streets10$152,018
Street Resurfacing Local Streets10$51,622
Street Resurfacing Local Streets10$141,693
Street Resurfacing Local Streets10$106,399
Street Resurfacing Local Streets10$156,923
Street Resurfacing Local Streets10$76,249
Street Resurfacing Local Streets10$52,033
Street Resurfacing Local Streets10$388,688
Street Resurfacing Local Streets10$85,750
Street Resurfacing Local Streets10$136,742
Street Resurfacing Local Streets10$73,642
Street Resurfacing Thoroughfares10$571,847
Street Resurfacing Thoroughfares10$500,238
Traffic Intersection Capacity & Safety Improvement10$1,591,747
Alley Reconstruction11$360,000
Alley Reconstruction11$250,660
Alley Reconstruction11$283,465
Alley Reconstruction11$503,548
Alley Reconstruction11$43,730
Alley Reconstruction11$293,000
Alley Reconstruction11$214,032
Alley Reconstruction11$253,207
Alley Reconstruction11$355,348
Sidewalk Improvements11$1,363,027
Street Reconstruction Local Streets11$447,009
Street Reconstruction Local Streets11$509,024
Street Reconstruction Local Streets11$316,032
Street Reconstruction Local Streets11$473,965
Street Reconstruction Local Streets11$809,511
Street Reconstruction Local Streets11$184,889
Street Reconstruction Local Streets11$356,383
Street Reconstruction Local Streets11$469,004
Street Reconstruction Local Streets11$925,108
Street Reconstruction Local Streets11$775,443
Street Reconstruction Local Streets11$799,423
Street Reconstruction Local Streets11$794,462
Street Reconstruction Local Streets11$245,913
Street Reconstruction Thoroughfares11$1,066,503
Street Reconstruction Thoroughfares11$2,029,317
Street Reconstruction Thoroughfares11$1,167,548
Street Reconstruction Thoroughfares11$2,559,840
Street Resurfacing Local Streets11$244,559
Street Resurfacing Local Streets11$211,803
Street Resurfacing Local Streets11$113,842
Street Resurfacing Local Streets11$52,513
Street Resurfacing Local Streets11$52,376
Street Resurfacing Local Streets11$163,851
Street Resurfacing Local Streets11$171,603
Street Resurfacing Local Streets11$66,371
Street Resurfacing Local Streets11$201,170
Street Resurfacing Local Streets11$87,911
Street Resurfacing Local Streets11$121,868
Street Resurfacing Local Streets11$109,932
Street Resurfacing Local Streets11$162,136
Street Resurfacing Local Streets11$83,040
Street Resurfacing Local Streets11$530,964
Street Resurfacing Local Streets11$131,506
Street Resurfacing Local Streets11$145,466
Street Resurfacing Local Streets11$200,141
Street Resurfacing Local Streets11$197,294
Street Resurfacing Local Streets11$130,066
Street Resurfacing Local Streets11$37,353
Street Resurfacing Local Streets11$124,132
Street Resurfacing Local Streets11$139,189
Street Resurfacing Local Streets11$157,574
Street Resurfacing Local Streets11$59,373
Street Resurfacing Local Streets11$165,360
Street Resurfacing Local Streets11$167,487
Street Resurfacing Local Streets11$86,402
Street Resurfacing Local Streets11$141,007
Street Resurfacing Thoroughfares11$165,943
Street Resurfacing Thoroughfares11$1,226,602
Street Resurfacing Thoroughfares11$179,373
Street Resurfacing Thoroughfares11$1,032,767
Street Resurfacing Thoroughfares11$189,199
Street Resurfacing Thoroughfares11$76,240
Street Resurfacing Thoroughfares11$220,069
Street Resurfacing Thoroughfares11$264,007
Street Resurfacing Thoroughfares11$300,125
Alley Reconstruction12$549,731
Alley Reconstruction12$344,617
Alley Reconstruction12$275,821
Alley Reconstruction12$150,969
Alley Reconstruction12$218,491
Alley Reconstruction12$260,215
Alley Reconstruction12$269,500
Alley Reconstruction12$214,669
Alley Reconstruction12$285,695
Alley Reconstruction12$428,750
Alley Reconstruction12$456,411
Alley Reconstruction12$522,659
Alley Reconstruction12$106,061
Alley Reconstruction12$557,694
Alley Reconstruction12$504,504
Alley Reconstruction12$269,770
Alley Reconstruction12$273,592
Alley Reconstruction12$333,470
Sidewalk Improvements12$100,000
Street Reconstruction Local Streets12$528,539
Street Reconstruction Local Streets12$844,405
Street Reconstruction Local Streets12$381,520
Street Reconstruction Local Streets12$807,857
Street Reconstruction Local Streets12$808,518
Street Reconstruction Thoroughfares12$776,761
Street Reconstruction Thoroughfares12$1,353,262
Street Resurfacing Local Streets12$195,098
Street Resurfacing Local Streets12$144,746
Street Resurfacing Local Streets12$143,889
Street Resurfacing Local Streets12$137,646
Street Resurfacing Local Streets12$163,165
Street Resurfacing Local Streets12$182,236
Street Resurfacing Local Streets12$182,373
Street Resurfacing Local Streets12$163,851
Street Resurfacing Local Streets12$232,588
Street Resurfacing Local Streets12$109,143
Street Resurfacing Local Streets12$202,336
Street Resurfacing Local Streets12$50,181
Street Resurfacing Local Streets12$203,468
Street Resurfacing Thoroughfares12$870,363
Street Resurfacing Thoroughfares12$1,002,109
Street Resurfacing Thoroughfares12$714,949
Street Resurfacing Thoroughfares12$733,506
Street Resurfacing Thoroughfares12$316,418
Street Resurfacing Thoroughfares12$928,467
Street Resurfacing Thoroughfares12$1,378,860
Street Resurfacing Thoroughfares12$2,212,007
Street Resurfacing Thoroughfares12$1,754,016
Street Resurfacing Thoroughfares12$814,911
Street Resurfacing Thoroughfares12$367,147
Street Resurfacing Thoroughfares12$374,590
Street Resurfacing Thoroughfares12$597,883
Target Neighborhood12$500,579
Alley Reconstruction13$115,934
Alley Reconstruction13$322,959
Alley Reconstruction13$188,871
Alley Reconstruction13$290,472
Alley Reconstruction13$311,175
Alley Reconstruction13$251,615
Alley Reconstruction13$150,651
Alley Reconstruction13$317,545
Alley Reconstruction13$333,470
Alley Reconstruction13$309,901
Alley Reconstruction13$426,790
Street Reconstruction Local Streets13$793,965
Street Reconstruction Local Streets13$852,674
Street Reconstruction Local Streets13$778,586
Street Reconstruction Local Streets13$1,562,892
Street Reconstruction Thoroughfares13$3,018,832
Street Resurfacing Local Streets13$294,397
Street Resurfacing Local Streets13$411,943
Street Resurfacing Local Streets13$140,000
Street Resurfacing Local Streets13$364,609
Street Resurfacing Local Streets13$261,332
Street Resurfacing Local Streets13$830,643
Street Resurfacing Local Streets13$412,526
Street Resurfacing Local Streets13$115,351
Street Resurfacing Local Streets13$246,754
Street Resurfacing Local Streets13$372,361
Street Resurfacing Local Streets13$146,941
Street Resurfacing Local Streets13$448,095
Street Resurfacing Local Streets13$255,878
Street Resurfacing Local Streets13$458,694
Street Resurfacing Local Streets13$110,000
Street Resurfacing Local Streets13$315,183
Street Resurfacing Local Streets13$312,199
Street Resurfacing Local Streets13$446,576
Street Resurfacing Local Streets13$404,637
Street Resurfacing Local Streets13$580,150
Street Resurfacing Local Streets13$231,525
Street Resurfacing Local Streets13$252,174
Street Resurfacing Local Streets13$370,028
Street Resurfacing Local Streets13$237,287
Street Resurfacing Thoroughfares13$267,403
Street Resurfacing Thoroughfares13$321,940
Street Resurfacing Thoroughfares13$1,004,133
Street Resurfacing Thoroughfares13$558,541
Street Resurfacing Thoroughfares13$762,592
Street Resurfacing Thoroughfares13$455,127
Street Resurfacing Thoroughfares13$742,321
Street Resurfacing Thoroughfares13$230,393
Street Resurfacing Thoroughfares13$317,995
Street Resurfacing Thoroughfares13$429,539
Street Resurfacing Thoroughfares13$201,513
Street Resurfacing Thoroughfares13$470,356
Street Resurfacing Thoroughfares13$498,036
Street Resurfacing Thoroughfares13$414,501
Includes enhancements to parking, transportation access and a Texas u- turn13$10,000,000
Alley Reconstruction14$240,786
Alley Reconstruction14$205,751
Alley Reconstruction14$214,351
Alley Reconstruction14$138,548
Alley Reconstruction14$200,974
Alley Reconstruction14$223,906
Sidewalk Improvements14$750,000
Street Reconstruction Local Streets14$81,530
Street Reconstruction Local Streets14$110,305
Street Reconstruction Local Streets14$393,262
Street Reconstruction Local Streets14$425,675
Street Reconstruction Local Streets14$622,968
Street Reconstruction Local Streets14$611,557
Street Reconstruction Local Streets14$613,211
Street Reconstruction Local Streets14$423,691
Street Reconstruction Local Streets14$614,037
Street Reconstruction Thoroughfares14$1,144,230
Street Reconstruction Thoroughfares14$577,490
Street Reconstruction Thoroughfares14$547,557
Street Reconstruction Thoroughfares14$1,132,488
Street Reconstruction Thoroughfares14$489,841
Street Reconstruction Thoroughfares14$956,033
Street Reconstruction Thoroughfares14$765,799
Street Reconstruction Thoroughfares14$359,856
Street Reconstruction Thoroughfares14$516,797
Street Reconstruction Thoroughfares14$695,402
Street Reconstruction Thoroughfares14$620,156
Street Reconstruction Thoroughfares14$848,539
Street Resurfacing Local Streets14$74,568
Street Resurfacing Local Streets14$111,304
Street Resurfacing Local Streets14$465,382
Street Resurfacing Local Streets14$58,790
Street Resurfacing Local Streets14$104,546
Street Resurfacing Local Streets14$135,041
Street Resurfacing Local Streets14$70,144
Street Resurfacing Local Streets14$70,555
Street Resurfacing Local Streets14$57,727
Street Resurfacing Local Streets14$88,082
Street Resurfacing Local Streets14$68,909
Street Resurfacing Local Streets14$106,399
Street Resurfacing Local Streets14$107,393
Street Resurfacing Local Streets14$69,217
Street Resurfacing Local Streets14$329,691
Street Resurfacing Local Streets14$112,504
Street Resurfacing Local Streets14$337,300
Street Resurfacing Local Streets14$80,811
Street Resurfacing Local Streets14$135,657
Street Resurfacing Local Streets14$437,047
Street Resurfacing Local Streets14$370,028
Street Resurfacing Local Streets14$341,182
Street Resurfacing Local Streets14$305,000
Street Resurfacing Local Streets14$263,493
Street Resurfacing Local Streets14$129,894
Street Resurfacing Local Streets14$111,269
Street Resurfacing Local Streets14$107,016
Street Resurfacing Local Streets14$120,565
Street Resurfacing Local Streets14$86,710
Street Resurfacing Local Streets14$88,871
Street Resurfacing Local Streets14$123,171
Street Resurfacing Local Streets14$131,163
Street Resurfacing Local Streets14$130,957
Street Resurfacing Local Streets14$75,632
Street Resurfacing Local Streets14$704,600
Street Resurfacing Local Streets14$571,644
Street Resurfacing Local Streets14$44,590
Street Resurfacing Local Streets14$56,595
Street Resurfacing Local Streets14$61,294
Street Resurfacing Local Streets14$39,376
Street Resurfacing Local Streets14$100,156
Street Resurfacing Local Streets14$76,215
Street Resurfacing Local Streets14$85,476
Street Resurfacing Local Streets14$112,504
Street Resurfacing Local Streets14$82,080
Street Resurfacing Local Streets14$129,380
Street Resurfacing Thoroughfares14$155,482
Street Resurfacing Thoroughfares14$267,774
Street Resurfacing Thoroughfares14$261,538
Street Resurfacing Thoroughfares14$168,962
Street Resurfacing Thoroughfares14$447,855
Street Resurfacing Thoroughfares14$73,471
Street Resurfacing Thoroughfares14$195,956
Street Resurfacing Thoroughfares14$98,990
Street Resurfacing Thoroughfares14$236,876
Street Resurfacing Thoroughfares14$98,613
Street Resurfacing Thoroughfares14$139,430
Street Resurfacing Thoroughfares14$67,159
Street Resurfacing Thoroughfares14$114,905
Street Resurfacing Thoroughfares14$128,351
Street Resurfacing Thoroughfares14$117,752
Street Resurfacing Thoroughfares14$155,516
Street Resurfacing Thoroughfares14$116,345
Street Resurfacing Thoroughfares14$112,333
Street Resurfacing Thoroughfares14$179,218
Street Resurfacing Thoroughfares14$114,665
Street Resurfacing Thoroughfares14$58,790
Street Resurfacing Thoroughfares14$620,165
Street Resurfacing Thoroughfares14$231,525
Street Resurfacing Thoroughfares14$654,770
Street Resurfacing Thoroughfares14$210,739
Street Resurfacing Thoroughfares14$77,175
Streetscape / Urban Design14$1,000,000
Streetscape / Urban Design14$250,000
Target Neighborhood14$211,484
Target Neighborhood14$918,750
Thoroughfares14$3,750,000
Traffic Intersection Capacity & Safety Improvement14$85,750
Traffic Intersection Capacity & Safety Improvement14$150,000
Traffic Intersection Capacity & Safety Improvement14$350,000

Matching funds required

Certain projects for Proposition A, listed below, are contingent upon the city receiving matching funding from private grants or donations. The matching funds must be received before the city orders the next bond election following the November 7, 2017, election.[1]

DescriptionCouncil districtCost
Safety Improvements to the intersection of Garland/Gaston and East Grande Avenue. A total of $4,500,000 in match funding is being provided by the Texas Dept. of Transportation.2, 9, 14$1,100,000
Construct a new 4 lane divided roadway including a new bridge over UP railroad tracks just south of Forney Rd with sidewalk and bicycle facilities. The project is receiving a total of $9,913,563 in match funds from the North Central Council of Governments and private funding.7$9,200,000
Intersection Improvements at the LBJ/Skillman Interchange. Project includes lighting and streetscaping. Match funding of $65,000,000 provided by the Texas Dept. of Transportation.10$6,500,000
Pedestrian and bicycle safety enhancements including traffic signals, sidewalks, crosswalks, and lighting. A total of $4,456,656 in match funding from both the North Central Texas Council of Governments and the Texas Department of Transportation.14$1,100,000
Street reconstruction of Riverfront from UPRR tracks to Cadiz Street. Will also include bike facilities. Match funding of $4,600,000 from Dallas County.1, 2 ,6$4,600,000
Street reconstruction project. Will will also include bike lanes. $3,200,000 matching funds from Dallas County.1, 3$4,000,000
Construct a new 4 lane undivided roadway with bike lanes. $3,200,000 in match funding8$1,800,000
Convert existing roadway to a two way facility. The project is receiving a total $12,800,000 in match funds14$8,000,000
Install proper drainage improvements at these locations. Match funding of $250,0009$700,000
Reconstructing an existing 4 lane undivided roadway to a 4 lane divided roadway. $4,000,000 in match funding is being provided by the Texas Dept. of Transportation.7$2,000,000

Text of measure

Ballot title

The following is the bond issue proposition title:[1]

THE ISSUANCE OF $533,981,000 GENERAL OBLIGATION BONDS FOR STREET AND TRANSPORTATION IMPROVEMENTS, THE ESTIMATED AMOUNT OF REPAYMENT, INCLUDING PRINCIPAL AND INTEREST BASED ON CURRENT MARKET CONDITIONS BEING $724,650,750.[3]

Ballot question

The following is the ballot proposition language:[1]

Shall the city council of the city of Dallas, Texas be authorized to issue general obligation bonds in the aggregate principal amount of $533,981,000 for the purpose of providing funds for permanent public improvements, to-wit: planning, designing, constructing, reconstructing, improving, extending, reconfiguring, and expanding streets, off-street parking, circulation elements, thoroughfares, freeways, intersections, alleys, medians, sidewalks, bridges, and pedestrian and bike ways, including related storm drainage facilities and improvements, signalization, pedestrian warning devices, signage, markings, video roadside cameras, and other traffic and signal controls, street lighting, pedestrian lighting, landscaping, streetscape and median improvements, railroad crossing quiet zones and the related acquisition of land; said bonds to mature serially over a period not to exceed twenty (20) years from their date, to be issued in such installments and sold at any price pr prices and to bear interest at any rate or rates as shall be determined within the discretion of the city council under laws in effect at the time of issuance and to provide for the payment off the principal and interest on said bonds by levying a tax sufficient to pay the annual interest on and to create a sinking fund sufficient to redeem said bonds as they become due, where $724,650,750 is the estimated amount of repayment, including principal and interest, based on current market conditions?[3]

Support

The Dallas Bond Campaign led the support of the 10 bond proposals on the ballot in 2017.[4]

Supporters

Officials

  • Tom Leppert, former Dallas mayor
  • Laura Miller] former Dallas mayor
  • Ron Kirk, former Dallas mayor

Organizations

  • AIA Dallas
  • African American Museum, Dallas
  • American Heart Association
  • BikeTexas
  • Circuit Trail Conservancy
  • Dallas Area Cultural Advocacy Coalition
  • Dallas Arts District
  • Dallas Black Chamber of Commerce
  • Dallas Citizens Council
  • Dallas Parks Foundation
  • Dallas Regional Chamber
  • Dallas Summer Musicals
  • Friends of Dallas Parks
  • Friends of Fair Park
  • Greater Dallas Hispanic Chamber of Commerce
  • Greater Dallas Planning Council
  • Metro Dallas Homeless Alliance
  • North Dallas Chamber
  • Regional Black Contractors Association
  • Regional Hispanic Contractors Association
  • Southeast Dallas Hispanic Chamber
  • State Fair of Texas
  • Stonewall Democrats of Dallas
  • Texas Discovery Gardens
  • The Real Estate Council

Media

  • Dallas Morning News said: "The largest investment by far is the city's outdated traffic signal system. The bond includes $20 million to synchronize signals to reflect the latest traffic trends. And $18 million would pay to install traffic lights at 63 locations. How bad does Dallas need these fixes? If your own experience driving on our streets doesn't convince you — seriously, we're guessing that's enough — then consider the city's future. As Amazon considers where to open a second headquarters, Dallas is a serious contender. If the city can't get a handle on its street improvements now, consider what the problem would look like with tens of thousands more people coming to work downtown every day. Dallas needs to pass Proposition A."[5]

Opposition

Opponents

  • Lee M. Kleinman, Dallas City Council member[6]

Arguments against

Opponents made the following arguments in opposition to the bond package:[7]

  • The language for some of the 10 bond propositions is vague which gives too much room for city officials to use the bond money for something other than what was listed.
  • Some opponents of the bond package argue that Dallas should not borrow money for road maintenance.
  • Some opponents argue that organizations charged with managing Fair Park and other private-public partnerships are poorly run.

Background

At the beginning of the city's fiscal year, which was October 1, 2017, the city carried an aggregate amount of $1,632,595,997 in tax-supported debt obligations, with $1,007,772,469 in outstanding interest. Prior to the election, the ad valorem tax rate was 78.25 cents per $100 in valuation, with 22.24 cents of that tax used to pay principal interest on the city's outstanding general obligation debt. Since all bonds in this package were approved, an additional $374,875,500 was set to be added to the amount owed in outstanding interest, for a total of $1,382,647,969, which city officials estimated could increase the ad valorem tax rate used to pay the city's interest owed.[1]

Path to the ballot

See also: Laws governing local ballot measures in Texas

Proposition A was part of a 10-proposition bond package totalling $1.05 billion in proposed new debt added to the November 2017 ballot by a vote of the Dallas City Council.[8]

The bond proposal started out as an $800 million proposal as of mid-June 2017.[9] On June 28, 2017, the Dallas City Council voted 13-2 to increase the proposal, giving initial approval of a $1.025 billion bond package and pushing the proposal forward in the process. Council members Lee Kleinman and Philip Kingston were the two dissenting votes. On August 9, 2017, the city council voted 11-4 to add $25 million to the bond package and also voted 14-1 to put the propositions on the November 2017 election ballot. Councilman Kleinman was the only dissenter in the final vote. The added $25 million was earmarked for expansion of Klyde Warren Park, streetscaping in the Medical District, and a downtown water gardens project.[10]

Recent news

The link below is to the most recent stories in a Google news search for the terms Dallas street bond issue Proposition A. These results are automatically generated from Google. Ballotpedia does not curate or endorse these articles.

See also

External links

Footnotes