St. Helena Unified School District bond proposition, Measure C (November 2012)
A St. Helena Unified School District bond proposition, Measure C ballot question was on the November 6, 2012, ballot for voters in the St. Helena Unified School District in Napa County, where it was approved.[1]
Measure C authorized the school district to borrow $30 million.[1]
A 55 percent supermajority vote was needed for approval.
Election results
| Measure C | ||||
|---|---|---|---|---|
| Result | Votes | Percentage | ||
| 2,782 | 59.58% | |||
| No | 1,887 | 40.42% | ||
- Final certified results from the Napa County elections office.
Text of measure
The question on the ballot:
| Measure C: "To improve student achievement, college/ career readiness, and student safety by upgrading classrooms and instructional technology for improved teaching/learning in technology, science, math and other core subjects; replacing/constructing/improving school facilities, including the high school auditorium, and safer playing fields; and improving energy efficiency/conservation, generating savings to support instruction, shall St. Helena Unified School District issue bonds not to exceed $30 million, at legal interest rates, with citizens’ oversight, annual audits and all funds benefiting local schools?"[2] |
See also
External links
Footnotes
- ↑ 1.0 1.1 Napa Valley Register, "My Turn: How we’ll cover the elections," August 9, 2012
- ↑ Note: This text is quoted verbatim from the original source. Any inconsistencies are attributable to the original source.
|
This article about a local California ballot measure is a sprout. |